Home / Services
Structured Cabling
Services Overview
We install and certify the cabling layer: copper and fibre, patch panels and frames, cable trays, baskets and ladders, overhead and underfloor pathways, plus full patching and labelling. Every link is tested and certified, and you receive cable schedules and port maps, so the next engineer to open the cabinet can trace a link in seconds rather than an afternoon.
Why It Matters
Cabling is where good datacenters quietly become bad ones. Untested links, no labelling and no schedules turn a five minute change into a three hour outage hunt, and blocked airflow behind badly routed bundles cooks the hardware in front of it. Structured, tested and documented cabling pays for itself the first time something breaks at 3am.
How It Works
01. Pathway and containment design
02. Tray, basket and frame installation
03. Copper and fibre pulling and termination
04. Testing, certification and labelling
05. Patch schedules and documented handover
We're here to help
Need cabling installed, certified or cleaned up? Send us your rack layout and port counts and we will scope the pathways, the terminations and the testing.
Copper from Cat6 to Cat6A and Cat8, and fibre in OM3, OM4, OM5 and single mode, with the matching patch panels, cassettes and frames. We install to structured cabling standards rather than ad hoc runs.
Yes. Every copper and fibre link is tested to standard with a calibrated tester and you receive the certification results as part of the handover pack, not as an optional extra.
Fibre for backbone, longer runs and high speed uplinks such as 40G, 100G and above. Copper is still practical for shorter in-row and top-of-rack connections. Most halls end up with a designed mix, and we plan it against your switch topology.
Yes. Cabling remediation is a common request: re-routing, re-labelling, retesting, removing abandoned cable and restoring airflow. We do it in staged windows so nothing goes down unexpectedly.
Yes. Overhead ladders and baskets, underfloor trays, risers and containment for both copper and fibre, designed with growth capacity rather than filled to the brim on day one.
Cable schedules, port maps, rack elevations, test and certification results and photo documentation, delivered in a form your operations team can actually use.
